Did I Uncover a $100,000,000 Mistake with the Millennium Tower "Fix"?
1M views · Apr 5, 2023 · News & Politics
Comments · 6.1K
@BuildingIntegrity · 3 years ago (edited) · pinned
Small correction: The Engineers that designed the "Fix" were not the structural engineers for the original building design. I meant to refer to the engineers of the current "fix" as the "original fix engineers"... not the original building engineers. If you are an engineer and want to perform your own calculations, additional material strengths can be found in the video description. I have emailed the SF Department of Building Inspections and Supervisor Peskin re this concern. I will update you all when I know more.
1.4K
@GeneralBolas · 3 years ago
This really sounds like a holdover from the 52-piling design where the plates probably would have been fine, but then they dropped 2/3rds of them and nobody really thought to check that particular part.
524
@theharbinger2573 · 3 years ago
I am afraid this project is headed for a monumental NOVA / Frontline collaboration episode in a few years. Thanks for the update.
366
@philnichols5611 · 3 years ago
I am a retired consulting mechanical and electrical engineer, having worked with architects for 52 years in the design of commercial and municipal buildings. I have followed your YouTube videos and found them very interesting and informative, especially the Surfeside project. Recently I "stumbled on" a short video showing the potential failure of an apartment building for college students in Manhattan, Kansas. After viewing the video I sent an email to the city engineer, suggesting she watch that video. The apartment building was apparently fully occupied at that time. In the email I suggested that the city engineer contact Building Integrity. I did not have any reply from the city engineer. Interesting, the next day or so I saw a news report that the Manhattan fire department had condemned the building. I have not followed up, nor have there been any communications. Thanks for your good work. PN
3.4K
@annoyingbstard9407 · 3 years ago
I’m a professional road sweeper and my concern is that wall might collapse if I lean my broom against it.
220
@HornetVF103 · 3 years ago
You might want to consider sending this to the Insurance company providing the liability insurance. They could put the breaks on this and force the A&E and Construction company to provide the calculations. Most Insurance companies have engineers on staff.
687
@garrettkajmowicz · 3 years ago
I have an engineering degree in an unrelated discipline. In addition to that plate (and the associated nuts), I'm also worried about the ability to transfer that much force to the existing building. The existing foundation was designed to have force distributed widely across the base. Putting that much force on the edge strikes me as a great way to run into weird loading regimes including torque, which concrete doesn't handle too well.
1.8K
@garydavidson1970 · 3 years ago
All parties involved need to face the hard truth that the building should be dismantled completely.
794
@RockHudrock · 2 years ago (edited)
UberEats driver here, If the threaded rods are loaded beyond their yield strength, couldn’t you end up with a cascade failure, once one of them snaps, the load is transferred to the adjacent rod, which snaps, and so on. Kind of like the Francis Scott Key bridge, but underground.
387
@cm8174 · 3 years ago
I’m betting the plate in question might have worked with the original count of jacks they were putting in, then someone made the decision to reduce the count and they never re-visited the design of that small plate to compensate for increased loads.
296
@countfrackula6707 · 3 years ago
This tower is the exact case-study of why doing things cheaper is rarely better. If they'd done it right the first time, this wouldn't have been an issue in the first place.
457
@toothlessseer3153 · 3 years ago
So far, the building has tilted about 30 inches. (Another 6 inches, the plumbing and elevators will stop working).<br><i>These are Hail Mary moves to delay that day by a few years (so that the chief engineer & city officials are retired when this happens).</i>
429
Up next

Millennium Tower - Why you won't hear any more news about this building.
Casey Jones - Professional Engineer · 232K views

Zeroing in on the Initiation of the Surfside Collapse
Building Integrity · 263K views

When the client says "You're wrong"
Blacktail Studio · 460K views

World's Largest Advanced Wastewater Treatment Plant
TDC · 97K views

What's REALLY Causing Millennium Tower to Sink and Tilt - Is the Developer at Fault?
Building Integrity · 160K views

How Waves Could Power A Clean Energy Future
CNBC · 465K views

How Hoover Dam Works
Animagraffs · 4.4M views

How Did the Engineers Miss This?
Building Integrity · 351K views

What Really Happened at the Millennium Tower?
Practical Engineering · 3.9M views

16 Days Before the Surfside Collapse - The Warning Signs Were There
Building Integrity · 678K views

What are Engineers Missing with Storm Surge?
Building Integrity · 39K views

Construction Fails: When Projects Go Wrong
The B1M · 3.6M views

This El Niño Could Permanently Change Our World
New Scientist and Dr Russell Arnott · 1M views

San Francisco’s Millennium Tower Problem Is Worse Than I Thought
Arvin Haddad · 255K views

The Anatomy of a Breakthrough: Designing the First American Jetliner
DroneScapes · 829K views

How Engineers Solve the Problem of Punching Shear Failure
Building Integrity · 187K views

Millennium Tower Issues - SF Responds
Casey Jones - Professional Engineer · 49K views

Millennium Tower - A Solution Without a Problem? (San Francisco's Leaning Tower Part 3)
Building Integrity · 97K views

Engineering Failures Found in the Champlain Towers South Drawings - Surfside Collapse
Building Integrity · 576K views

Millennium Tower - $500 Million Wasted?
Casey Jones - Professional Engineer · 114K views