Ads skipped

Why London's 94 New Tube Trains Still Haven't Carried a Passenger

16K views · Nov 7, 2026 · Autos & Vehicles

Comments · 36

  • @archiprintuk1149 · 2 weeks ago

    The trains are being assembled at a factory in Goole, only a partial portion of them were built in Germany. Link below to Google maps showing them in sidings in Goole.<br>&quot;The program&quot; inbcludes replacement trains for the Central line (x100), Bakerloo line (x40) and Waterloo &amp; City line (x10) as well as the x94 for the Piccadilly line trains featured here.<br>Yes the cost has gone up though, the cost of everything has gone up.

    7

  • @Ernst-d3h · 6 days ago

    I still think of the picc line trains as new ones,after the 59 stock, how time flies

  • @jackmellor5536 · 2 weeks ago

    This video pronounced depot two diffrent ways

    6

  • @LostsTVandRadio · 1 day ago

    I thought passenger windows were measured in feet and inches. Turns out they&apos;re measured in years and months!!

  • @CFTABRS2545 · 9 days ago

    NEVER LET Hitachi built new LU trains because they will just crack and break. 😂😂😂😂

    2

  • @Silverfoxwolfen · 8 days ago

    Why would they need to strengthen the power supplies if they use 20% less energy?

  • @ReubenS08 · 11 days ago

    They have the new trains ready for use which I dont get why

  • @TheMagicktony · 20 hours ago

    I don’t think they are going to ready it’s going to take them another 10 years to test on London Underground?

  • @richardgray45 · 12 days ago

    Find a TfL project that was delivered on time and to budget.

  • @ipfreely · 2 weeks ago

    What is concerning about these trains are the use of intermediate cars without their own bogies.<br><br>The structural couplings must transfer the weight and operational loads of these unsupported cars to the adjacent bogie-equipped cars. They must also accommodate pitch, yaw and roll as the train travels along the track.<br><br>This introduces additional structural stresses, fatigue considerations and potential failure points at the connections between cars. These components will be subjected to repeated loading from acceleration, braking, cornering and track irregularities throughout the train’s service life.<br><br>I understand that articulated designs have been used successfully on street trams, but that doesn’t automatically make them suitable for a high-frequency Underground railway. These trains operate at higher speeds in many sections and are subjected to demanding service schedules, heavy passenger loads and repeated acceleration and braking.<br><br>It seems to me that the reduction in bogies might come at the cost of increased structural complexity and potentially more complicated maintenance. I would be concerned about the long-term reliability of these connections and whether the maintenance burden will outweigh the benefits of the design.

    6

  • @OverSpotterBlackHUS1995 · 12 days ago

    Ok. Why?

  • @blksoul26 · 11 days ago

    Can the trains run on the bigger tunnel lines instead?

Up next

LIVE

Why London Withdrew These Spanish Trains After 35 Days

ForSomeReason · 32K views

LIVE

I took the train from London to Inverness, because I'm stupid

Jago Hazzard · 187K views

LIVE

The Worst Tube Map Ever Drawn

Jago Hazzard · 157K views

LIVE

Why Southern England's Trains Still Run on a Third Rail

TheLongWayRound and ForSomeReason · 130K views

LIVE

This Scottish Railway Was Closed for 46 Years Then the Trains Came Back

Rails Reborn UK · 892 views

LIVE

The London Underground That Almost Existed: 3 Real Tube Lines London Never Built

Beneath The Lines · 9.4K views

LIVE

What If It Never Stopped Raining for 10 Years?

Your Other Life · 1M views

LIVE

Why Britain's High-Speed Commuter Trains Came From Japan

ForSomeReason · 42K views

LIVE

Why the Jubilee Line Crosses the Thames Four Times

ForSomeReason · 23K views

LIVE

Finding Space for New Underground Lines in London

The Line Ahead · 12K views

LIVE

Why London Still Needs Metro Lines

The Line Ahead · 12K views

LIVE

China’s BYD Is Quietly Taking Over London’s Buses — Here’s How

Shift Atlas · 68K views

LIVE

Why The Elizabeth Line Took 30 Years

TheLongWayRound and ForSomeReason · 11K views

LIVE

What Happens to London Buses After Retirement (The Truth Nobody Talks About)

Derek Thwaite · 60K views

LIVE

Why London Abandoned a Tube Extension After Work Had Started

ForSomeReason · 27K views

LIVE

Why British Trains Had Doors You Could Open While Moving

ForSomeReason · 31K views

LIVE

The Tube Line That Ran One Stop (Until London Gave It Up)

Beneath The Lines · 7K views

LIVE

The Cursed Tube Station Nobody Talks About

Forgotten London · 52K views

LIVE

The Class 323 - The End of the Line? | A history of the Class 323s

Vanmanyo · 15K views

LIVE

The £410M Tube Upgrade That Collapsed in Four Years

Steel & Interest · 543 views

YouTube, with the door locked.

Aegis plays a clean stream instead of YouTube's player, so pre-roll ads, trackers, and fingerprinting never ride along. Drop Shields any time if you want the official player back.